Services contract

Enedis
For over 25 years, Clemessy has been carrying out work on the ERDF networks : distribution, public lighting and road traffic sign networks.
Specialising in work on LV and HVA overhead lines and in EDF network substations, we also carry out connecting work for private individuals and voltage change work.
We have the required heavy facilities to carry out work (support lifting trucks, high-rise cradles, earthmovers, etc).
We are authorised by the DRIRE (Regional Industry, Research and Environmental Authority) and equipped to transport PCB type hazardous materials.
The line fitters are authorised to carry out overhead, overhead & underground or IOPD type live work and trained to make the LV and MV connection accessories.

Power grids

SBEE (Société Béninoise d’Energie Electrique) - Benin
Engineering and "turnkey" completion of the following :

  • The extension to the Cotonou, Porto-Novo and Abomey-Calavy power grids : 40 km of mixed MV/LV line, 650 km of LV line with public lighting, 61 MV/LV substations and 8 H61 MV/LV substations
  • The consolidation of the Cotonou, Porto-Novo and Zopa grids: 4.6 km of 63 kV underground link, 24 km of 20 kV underground grid and 11 MV/LV substations.


ECICO SOCIETE EQ. GUINEA.
Increasing the power capacity of the SEGESA grid in the town of EBEBIYIN (Ebebiyin power plant)
Within the framework of the project to increase the power capacity of the SEGESA grid in the town of EBEBIYIN (Ebebiyin power plant) in Equatorial GUINEA, ECICO SOCIETE awarded CLEMESSY the contract for the engineering, purchases, erection and commissioning of the electrical installation work.
Main equipment :

  • MV/LV HVA substations,
  • Refurbishment of the power plant,
  • Paralleling two 2000 kVA generator sets/li>
  • Construction of a MV substation


ECICO SOCIETE EQ. GUINEA.
Refurbishment and modification of the MV/LV power supply to the BATA Presidency building substation. Within the framework of the project involving the refurbishment and modification of the MV/LV power supply to the BATA Presidency building substation in Equatorial Guinea, ECICO SOCIETE awarded CLEMESSY the contract for the engineering, purchases, erection and commissioning of the electrical installation work.
Main equipment:

  • HVA power & lighting
  • MV/LV power & lighting
  • Underground MV grid
  • reconfiguration of the MV/LV grid inside the Presidency building
  • construction of two MV substations