> Search
Search
> Se connecter
Connexion
Utilisateur  Mot de passe 
>> J'ai perdu mon mot de passe

Vous n'avez pas encore de compte ? Inscrivez-vous !

Commerce


New works and refurbishment

New works and refurbishment - Shopping centre, hypermarket - Commerce

Auchan Okabé – Le Kremlin Bicêtre (France)
Designing and building the hypermarket’s power & lighting facilities: HV substation with main LV board,  LV distribution,  equipment for the plant areas, laboratories, sales area and offices.

Auchan Le Pontet – Avignon (France)
Designing and building the power & lighting facilities as part of the refurbishment of the hypermarket. The refurbishment of the plant areas, sales area, line of checkouts, laboratories and offices was carried out while the shop was open to the public.

Auchan - Aubagne (France)
Designing and building the power & lighting facilities as part of the refurbishment of the hypermarket. The refurbishing work related to the technical equipment (HV substation, main LV board), the plant areas, the sales area, the laboratories (meat, fish, bread sections), the line of checkouts as well as the offices.

Shopping centre

Sogea Docks – Lillebonne (France)
Designing and building the power & lighting, communications and anti-intrusion facilities at the « DOCK VAUBAN » shopping centre located in the town of Le Havre, comprising 70 shops.

Altarea Cogedim Centre d’affaires OKABE - Le Kremlin-Bicêtre (France)
Designing and building the power & lighting facilities for the shopping and business centre at Kremlin-Bicêtre (France).
This building complex covering an area of 72,000m²  groups together :

  • a shopping centre comprised of an 11,000 m² hypermarket, four medium-sized shops covering a total of 6,000 m² and around fifty boutiques over an area totalling 9,000 m²
  • a 25,000 m² business centre with a company restaurant for 1,000 people.
  • a car park with approximately 2,000 spaces on four underground levels.

 

Some figures : 

  • 6 MV substations with 11 transformers
  • 5 main LV boards
  • 127 distribution cabinets
  • 14,000 lighting points
  • 1 centralised technical management (CTM) system with supervision of 2,000 electricity points
  • 40 km of cable trays
  • 300 km of cables

Altarea Cogedim - Cour des Capucins - Thionville (France)
Designing and building the power & lighting and communications facilities for the "Cour des Capucins" shopping centre and its underground car park.

Altarea - Mulhouse (France)
Designing and building the power & lighting and communications facilities for the "Porte Jeune" shopping centre in Mulhouse (23,000 m²) and the 50 boutiques in the centre.

Designing and building the power & lighting and communications - Shopping centre, hypermarket - Commerce

Energy supervision

Energy supervision - Shopping centre, hypermarket - Commerce

Auchan - 126 sites in France
Energy supervision (electricity, water, gas) for 126 AUCHAN and IMMAUCHAN hypermarkets
Designing and implementing an energy supervision system for 126 AUCHAN hypermarkets.
Putting in place and centralising sensors on the various energy sources (electricity, water, gas), implementing the transmission and retransmission means to the supervisor via GPRS.


To know more about our references and offers, contact our expert !