As leader of a consortium, Clemessy won the contract involving the supply, erection and ensuring the operational readiness of the generator sets with emergency back-up diesel engines for all the 900 and 1450 MW units of the French nuclear power plants, i.e. a total of 38 tranches, 2 of which optional.

Clemessy Nucléaire is responsible for designing and building the electrical systems and the monitoring and control systems for the generator sets’ auxiliaries.

The project in figures



November 2016
Discover the latest news from the DUS project: 

At the St Laurent des Eaux power plant 

Work continues at the St Laurent des Eaux power plant, the lead plant. On 30th November, the generator set arrived on site. It was put in place in the building and since then the mechanical connection work has been in progress. Testing will continue until March 2017. 

At the Tricastin power plant 
Construction work on the building has started at the Tricastin reactor 2. On 15th December, the lifting and installation operations concerning the first tank were successfully completed.